The Challenge
The space had not been updated since the 1980s and there were three key challenges:
As the office was fully operational, the work needed to be undertaken with minimal noise disruption. The work was carried out across two phases so the client could continue to operate and the noisier aspects of the project were carried out after hours to reduce the impact on the client.
The ceilings were at different heights which meant a new bulkhead needed to be installed to realign the height.
A design solution was needed for concealing all the power cables for the banks of office desks in the open plan area. To be able to hide these and keep the space tidy, false columns were installed to complement the existing and to neatly house the power cables from the ceiling to the banks of zoned desks.